The soil depot is established on the top of the former dump site.
The depot is divided into 3 parts:
· A depot for topsoil. Aroused from the construction of the Waste Treatment Centre.
The soil will be used a final cover on top of the landfill cell.
· A depot of red clay soil. Aroused from the construction of the Waste treatment Centre. The soil will be used for establishing Embankments for the second phase of the landfill cell.
· A depot for maturing compost, before utilisation. The soil may be used in parks and gardens. (not recommendable for agriculture purposes.)